Dallas Directional Drilling

Water & Force-Main Boring in DFW

The suburbs building fastest — Collin, Denton, Kaufman, Ellis — are the ones pushing water and sewer across ground that was pasture two years ago, and the crossings under new arterials and existing creeks are bore work. We pull HDPE and fusible PVC on line and grade, with fusion by qualified operators and pressure testing to the district's standard.

Force mains deserve their own sentence: profile matters, air-release placement matters, and a bore that wanders vertically creates maintenance problems the district owns for decades. That's why grade-critical shots get walkover guidance verified against the plan profile at every rod, and why we'll tell you when a crossing is better suited to another method than pretend HDD fits everything.

Municipal work in this metro means inspector relationships and submittal discipline — bore plans, mud plans, and fusion certs in the package before the crew mobilizes.

ProductHDPE · FPVCfusion certs in submittal
Diameters2"–16"larger by scope review
Testingto district stdpressure + bacT by others where specified

Scope this crossing